Scotland brings 10-day damp investigations into force

Scottish private landlords must now investigate damp and mould reports within 10 working days, under repair regulations that came into force on 6 October.

The new rules also require a written summary for the tenant within three working days of the investigation and the start of any required safety work within five working days. They apply to private residential tenancies and add damp and mould to Scotland’s repairing standard.

Landlords with Scottish homes now need a documented route from a tenant report to inspection, written findings and repair instructions. Missing one stage may matter if a case reaches the First-tier Tribunal, which must consider compliance with the new duties when assessing the repairing standard.

New repair timetable for Scottish landlords

The 10-day clock is for completing the investigation, not simply arranging an appointment. Where damp or mould is found, the landlord must provide the tenant with a written summary of what the investigation found. Any required relevant safety work must then be started within five working days.

The regulations allow for events outside a landlord’s control. In that situation, the landlord must write to the tenant explaining why the deadline cannot be met and give a reasonable revised timescale. Reasonable steps should also be taken, where practicable, to limit the effect of damp or mould while the duty cannot be completed.

This follows Residential Landlord’s report that damp affected 10% of private rented homes, and its coverage of wider Scottish landlord pressures. The new timetable turns a broad repair obligation into a sequence that can be tested against dates, emails and contractor records.

The regulations’ explanatory note confirms that the tribunal must take the duties into account when considering whether a private landlord has met the repairing standard.

Records will be as important as repairs

Speed alone will not settle every damp case. A report can involve a leak, condensation, building defects or tenant access problems, and the rules recognise that completion may sometimes be outside the landlord’s control. The safer approach is to record the report date, attempts to arrange access, the inspector’s findings, the written response and the date work starts.

Portfolio landlords should also check that their agent agreement says who issues the written summary and who chases a contractor if the first appointment fails. An agent can manage the process, but the statutory repairing-standard duty sits with the landlord.

The change is more immediate than a future Scottish housing proposal. It is already in force, so a complaint made today should enter a process capable of meeting the new timetable.

There is no benefit in treating the deadlines as a reason to rush a weak diagnosis. The obligation is to investigate, communicate and begin the necessary work promptly. A good inspection should still identify whether water ingress, ventilation, heating, insulation or tenant use is contributing, then set out the work needed and any follow-up visit.

Landlords should review their out-of-hours reporting route as well as weekday maintenance arrangements. A report received late on a Friday can otherwise leave little time to establish contact, obtain access and appoint a competent person within the statutory window.

Opinion

A clear timetable is better than vague expectations, but it will expose disorganised management quickly. Scottish landlords do not need to solve every cause of damp in five days. They do need to show that the report was investigated properly, the tenant was told what happened and necessary work was started without drift.